Fonterra Fibre Cabling Upgrade

Aotea Communications — a division of Aotea Electric Invercargill, are completing a full site fiber backbone upgrade at the Fonterra Edendale site. This project consists of installation of 10,000m of 12 core fiber, 2200 fiber splices, installation of 56 server cabinets and install of cat6a data cable. This 9000-hour project needs to be well organised to deal with the challenging nature of a milk processing plant and engaging with over 50 different departments to make sure the projects keeps moving forward and get delivered on time.

NZ Post Depo

Aotea Electric Invercargill was engaged in the early design phase of this project. We worked alongside the client and NZ post to help design a functioning, fit for purpose building that will fulfill their requirements now and into the future. A full specification and drawing set were produced for the main electrical, Security and communications including concepts and construction drawings for peer review which was accepted with minimal changes required. Aotea Electric was then given an opportunity to price these works, and when we did, it came under the client’s budget. A specification was given to Aotea Electric Invercargill for the Electrical for Mechanical, we also completed full drawings and BMS design to pass the relative building standards.

Data Centre Electrical Services

Aotea Electric Invercargill has access to a wealth of knowledge and expertise through the Aotea Group of Companies, including Aotea Electric Auckland expertise in managing large-scale electrical projects. A prime example is the successful completion of three separate data centres. These include the Spark Data Centre, as well as the CDC Data Centre located in Hobsonville and Silverdale. The combined value of these electrical projects exceeds 65 million dollars, requiring significant resources to ensure on time and on-budget delivery of these complex projects.

Langlands Hotel Electrical Fit-Out

Aotea Electric Invercargill completed both the main electrical and electrical for mechanical for the new Langlands Hotel located in central Invercargill. The hotel operates 78 guest bedrooms along with 1x café, 1x bar and 1x restaurant. Over 15,000 hours were completed by our onsite team to deliver this seven-story hotel worthy of its4.5-star rating. We worked alongside the electrical consultants to help deliver on their electrical design and ensure budgets were met. Aotea Electric Invercargill was recognised as the “Best Performing Sub-Contractor” on site by the main contractor.

2026 © Aotea Electric Invercargill. All rights reserved.

Secret Link